|
发表于 2007-1-30 22:16:10
|
显示全部楼层
任务包有几种,详见下表:
Type 1. Saves AFTER 16.66 , 33.33 , 50.00 , 66.66, 83.33, 100.00 (6 checkpoints / segments)
Type 2. Saves AFTER 33.33 , 66.66, 100.00 (3 checkpoints / segments)
Type 3. Saves AFTER 50.00 , 100.00 (2 checkpoints / segments)
Type 4. Saves ONLY when 100% complete! (Cant be interrupted at all)
Type 5. Saves AFTER first 6.25% and subsequent multiples there off (16 checkpoints / segments)
Type 6. Saves AFTER first <=5.0% and subsequent multiples there off (20 or more checkpoints / segments)
Type 7. Saves AFTER first 25.0% and subsequent multiples there off (4 checkpoints / segments)
如果经常出现重算这种情况,可以考虑换一个存盘间隔短一些的项目来参加。 |
|