找回密码
 新注册用户
搜索
楼主: Youth

[项目新闻] [BOINC] [生命科学类] SIMAP

[复制链接]
发表于 2011-5-31 20:06:21 | 显示全部楼层
Message 109 - Posted 31 May 2011 11:14:57 UTC

The workunits for the about 400.000 new protein sequences (for the June release of SIMAP) will be available from Wed, Jun 1. We estimate that the batch for June will need about one week of work.

Best,
Thomas
回复

使用道具 举报

发表于 2011-6-11 08:37:06 | 显示全部楼层
Posted 10 Jun 2011 15:20:01 UTC

This afternoon the server was not available for several hours. This was due to regular technical maintenance that took much longer than expected due to unexpected issues. Now everything is running fine again - sorry for the long outage.

Best regards
Thomas
回复

使用道具 举报

发表于 2011-6-27 16:23:09 | 显示全部楼层
Message 111 - Posted 27 Jun 2011 7:13:10 UTC

The workunits for the about 100.000 new protein sequences (for the July release of SIMAP) will be available from Fri, Jul 1. We estimate that the batch for June will need about two days of work.

Best,
Thomas
回复

使用道具 举报

发表于 2011-7-31 21:31:55 | 显示全部楼层
Posted 31 Jul 2011 11:32:03 UTC

The workunits for the about 800.000 new protein sequences (for the August release of SIMAP) will be available from Mon, Aug 1. We estimate that the batch for August will need about two..three weeks of work.

Best,
Thomas

评分

参与人数 1基本分 +14 收起 理由
refla + 14 贵在坚持啊,赞!

查看全部评分

回复

使用道具 举报

发表于 2011-8-17 18:31:54 | 显示全部楼层
Message 120 - Posted 17 Aug 2011 8:56:50 UTC

Due to regular construction work the power in one of our server rooms will be completely shut down on Aug 24 and 25. This will also affect the BOINC database and web servers. We will therefore shut down the entire BOINC project from Aug 24, approx. 10 a.m. to Aug 25, approx. 3 p.m. During this time BOINCSIMAP will not be available at all.

We apologize for this outage and will keep the downtime as short as possible.

Best regards,
Thomas
回复

使用道具 举报

发表于 2011-8-30 17:07:56 | 显示全部楼层
Posted 30 Aug 2011 6:35:40 UTC

The workunits for the about 330.000 new protein sequences (for the September release of SIMAP) will be available from Wed, Aug 31. We estimate that the batch for September will need about one week of work.

Best,
Thomas
回复

使用道具 举报

发表于 2011-9-29 17:02:04 | 显示全部楼层
Posted 29 Sep 2011 5:44:02 UTC

The workunits for the about 260.000 new protein sequences (for the October release of SIMAP) will be available from Fri, Sep 30. We estimate that the batch for October will need about one week of work.

Best,
Thomas
回复

使用道具 举报

发表于 2011-10-30 09:29:48 | 显示全部楼层
Posted 29 Oct 2011 15:01:55 UTC

The workunits for the about 600.000 new protein sequences (for the November release of SIMAP) will be available from Mon, Oct 31. We estimate that the batch for November will need about two week of work.

Best,
Thomas

评分

参与人数 1基本分 +1 收起 理由
nekoko + 1 副教主翻译一下啦看不懂啦

查看全部评分

回复

使用道具 举报

发表于 2011-11-30 14:41:01 | 显示全部楼层
Posted 30 Nov 2011 6:33:43 UTC

The workunits for the about 500.000 new protein sequences (for the December release of SIMAP) will be available from Thu, Dec 1. We estimate that the batch for December will need about two week of work.

Best,
Thomas
回复

使用道具 举报

发表于 2012-1-4 14:49:18 | 显示全部楼层
Posted 3 Jan 2012 15:54:03 UTC

The workunits for the about 560.000 new protein sequences (for the January release of SIMAP) will be available from Thu, Jan 5. We estimate that the batch for January will need about two weeks of work.

Best,
Thomas
回复

使用道具 举报

发表于 2012-1-10 16:25:32 | 显示全部楼层
luguo 路过 进来看看
回复

使用道具 举报

发表于 2012-1-28 09:19:10 | 显示全部楼层
Posted 27 Jan 2012 14:54:45 UTC

The workunits for the about 410.000 new protein sequences (for the February release of SIMAP) will be available from Wed, Feb 1. We estimate that the batch for February will need about two weeks of work.

Best,
Thomas
回复

使用道具 举报

发表于 2012-2-2 09:35:59 | 显示全部楼层
Posted: 1 Feb 2012 | 15:18:33 UTC
Last modified: 1 Feb 2012 | 15:20:28 UTC

With the new server software release installed in the end of January we experienced that many more workunits are sent to the hosts as usual. We are currently investigating this, seems that the project contiguration settings are differently interpreted by the new software. To avoid total overload of hosts by SIMAP results, we have reduced the daily maximal number of results per host to 300. We will check and adapt this limit during the next days continuously.

Best regards
Thomas
回复

使用道具 举报

发表于 2012-2-29 13:41:29 | 显示全部楼层
Posted: 28 Feb 2012 | 17:19:30 UTC

The workunits for the about 485.000 new protein sequences (for the March release of SIMAP) will be available from Wed, Feb 29 (evening). We estimate that the batch for March will need about one..two weeks of work. To allow a smooth distribution of the results to all hosts, the maximum number of results in progress will be continuously increased from 2 to 50 per core.

Best,
Thomas
回复

使用道具 举报

发表于 2012-3-29 15:54:25 | 显示全部楼层
The workunits for the about 380.000 new protein sequences (for the April release of SIMAP) will be available from Fri, Mar 30 (morning). We estimate that the April batch will need about one week of work.

Best,
Thomas
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 新注册用户

本版积分规则

论坛官方淘宝店开业啦~
欢迎大家多多支持基金会~

Archiver|手机版|小黑屋|中国分布式计算总站 ( 沪ICP备05042587号 )

GMT+8, 2024-4-26 02:10

Powered by Discuz! X3.5

© 2001-2024 Discuz! Team.

快速回复 返回顶部 返回列表